The school refurbishment included the repair of roof & floor, toilets, supply of water tank and painting works.

  • Classroom floors were cemented
  • Roofs were repaired and False Ceiling was installed in 10 classrooms
  • 12,000 Liter Water Tank was delivered, cleaned and setup for use
  • Lighting & Electricity Hook-up
  • 12 Toilets were repaired and Arabic Toilets installed
  • 31 Steel doors, 44 Steel Windows, 10 Classrooms, 5 Offices, Stores, and 12 Toilets were painted both inside and outside.
  • 27 Student Desks with Chairs, 6 Staff Office Desks and 2 Office Cupboards were fabricated and delivered to the School.